Optical Disk Pre-installation Project
The optical disk project team has started gathering the information necessary to develop the project network predecessor activities and activity times in weeks. The results of their meeting are found in the following table.
Activity Description Duration Predecessor 1 Define scope 6 None 2 Define customer problems 3 1 3 Define data records and relationships 5 1 4 Mass storage requirements 5 2, 3 5 Consultant needs analysis 10 2, 3 6 Prepare installation network 3 4, 5 7 Estimate costs and budget 2 4, 5 8 Design section "point" system 1 4, 5 9 Write request proposal 5 4, 5 10 Compile vendor list 3 4, 5 11 Prepare mgmt. control system 5 6, 7 12 Prepare comparison report 5 9, 10 13 Compare system "philosophies" 3 8, 12